A&O
Yacht for Sale

Length: 89' 11" / 27.4m | Builder: Pershing | Year: 2008
A&O Yacht for Sale

A&O Yacht for Sale - 89'Pershing

Type: Motorboat
Category: Motor Yacht
Condition: Used
Length: 89' 11" (27.4m)
Beam: 20' 6" (6.23m)
Speed (Cruising): 38 Knots/43 MPH
Speed (Max): 44 Knots/50.63 MPH
Builder: Pershing
Model Year: 2008
Build Year: 2008
Location: Tivat
Staterooms: 4
Sleeps: 8
Features:
Price: €1,950,000 EUR
A&O yacht for sale
A&O Worth Avenue Yachts
Yacht for sale A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O
A&O

Contact Us For More Information

    Preferred method of contact:

    Detailed Information



    ELECTRONIC

    • Plotter/radar display Rayrnarine E120
    • Radar antenna Raymarine
    • Raymarine Autopilot ST 6002
    • Depth/Speed indicator Raymarine Tridata ST60+
    • Radio VHF Simrad RS87
    • Electronic engine controls
    • Digital LCD panel for engine monitoring
    • CCTV system with cameras in engine room and cockpit
    • Naviop Monitoring system
    • Intercom system
    • Compass
    • Joystick controls for flaps, trim, bow thruster and tiller
    • Rudder, flap and trim angle indicators

    EQUIPMENT

    • Generators 2x Kohler 20kW (2878 / 2683hrs in Aug 2021)
    • Air conditioning CONDARIA (fully serviced year 2017)
    • Hull finished in silver paint
    • Bow thruster 24hp
    • Shore fresh water intake
    • Watermaker Idromar 180 1/h
    • Black water system with tank (304 litres) and pump out
    • 2x Galvanised anchors
    • 2x Anchor Bruce 35Kg each
    • 2x Anchor chain 100m (14mm)
    • 2x Anchor windlasses Lofrans brand (24Vx2500 Watt) model Project X4
    • 2x Mooring winches Lofrans brand (24Vx1500Watt)
    • Electro-hydraulic gangway BESENZONI
    • Electro-hydraulic swim ladder
    • Garage for tender and jet ski at stern with electro-hydraulic door
    • 2x Pantograph side doors
    • Electric board system 220V / 63 Amp
    • Stainless steel cleats at bow, mid-ship, stern, and retractable on platform
    • Glendenning cable realer 16 mt for 220V / 63Amp dock single phase connector
    • Optical fiber lighting under bathing platform
    • Bimini sun top at bow with hydraulic motion

    INTERIOR

    • 3x Helm seats with electrical adjustment
    • Optical fiber lighting in cockpit and saloon
    • Dimmer for saloon and guest cabin lighting
    • Electric motion for beds in main cabin and VIP
    • Mosaic finish for master, VIP and guest showers

    AUDIO/ VISUAL

    • TV 42" LCD in saloon w/ electric raising device
    • TV 32" LCD in main cabin
    • TV 17" in VIP cabin TV 19" in guest cabins
    • TV 19" in crew area
    • Sound system with speakers and subwoofer in saloon and main cabin
    • Hi-Fi system with CD/DVD/Tuner in saloon
    • CD/DVD player in all guest cabins and crew area
    • Apple MAC Mini with keyboard and mouse in saloon and main cabin
    • Satellite TV antenna NT65 with decoder in all guest cabins
    • Waterproof speakers w/ volume control cockpit, bow area and upper sun deck

    DOMESTIC

    • Oven with microwave in stainless steel with glass door 60cm
    • Ceramic cooking top ( 4 rings)
    • Dishwasher ( 12 people)
    • Fridge unit side by side with fridge, freezer, and wine cooler
    • Washing machine branded Whirpool with 7 Kg basket
    • Separate washing machine and dryer in crew area
    • Extractor fan
    • Dumb waiter lift in galley/saloon
    • Furniture in cockpit with sink, fridge, barbeque
    • Fridge in saloon and main cabin
    • Exterior 24 V Fridge

    WORKS IN 2014-2020

    • New GPS antenna installed in 2014.
    • Service and reparation of seawater pump on starboard engine done in 2014.
    • Cleaning and painting of bilges in engine room completed in 2014.
    • New TV receivers in main saloon, VIP and twin cabins installed in 2014.
    • Full MTU service done in 2015, 2017, 2019.
    • 32x injectors of main MTU engine and 2 fuel pumps were replaced by MTU official dealer in 2015.
    • Polishing the rest of superstructure and Hull (year 2016).
    • Sanding of all teak (year 2016).
    • Repair of inverter Mass Sine 24V/5000 Watt completed in 2016.
    • Air condition unit serviced in 2017.
    • Water maker serviced every year, the salt water pump replaced in 2017.
    • Bow hydraulic table, the piston replaced in 2017.
    • A service of batteries, 16 batteries replaced in 2017.
    • Service of air conditioning seawater pump with replacement of the pump in 2018.
    • Air condition pump, black water pump, grey water pump were fully serviced in 2018.
    • CO2 system fully serviced in 2019 by the main factory like indicated by SVG maritime rules.
    • New EPIRB was installed in 2019, and new certificate was released valid until 2024.
    • New seawater pump on port engine mounted in 2019.
    • Tender service completed in full every 2 year a full service), tender engine battery was replaced in 2019.
    • All the extinguisher fire system was fully serviced in the 2019 during flag survey. A new document of compliance was released by SVG office.
    • Annual service on main engines and generators.
    • Arneson drive propulsion serviced .
    • Fire extinguisher serviced every 2 years.
    • Life rafts serviced every 2 years.
    • Jet ski basic service completed regularly.
    • Gangway sensor and hydraulic pipes replaced in 2020.
    • New sea chest valve on starboard side.
    • New fuel pump on starboard generator.
    • New seawater pump on port generator.
    • Cleaning of grey and black water tanks (every year).
    • Service of black water pump plus two freshwater pumps (every year washed and tested).
    • Sundeck area changing sikaflex plus polishing the whole area and protecting ptf coat.
    • Two coats of antifouling (every year).
    • Underwater zincs which replaced every 2 years, and every year Arneson; besides full anticorrosive treatment for aluminum is completed.
    • Leveling of corking.
    • Copal painting and areas varnished (Galley floor, Control bridge floor, saloon floor).
    • Upholstery job (realization of the new leather upholstery to 3 pilot seats).
    • Kohler generators full service provided and replacement of both elbows for exhaust water/gas separator.
    • Electronic board of main 220V fridge was replaced.
    • New exterior teak table and new ALU stand.
    • 2 alternator 24 Volt 80 A full serviced (labor and new spare parts (like brush & bearings) were installed.
    • 2 motors of main engine start 24 V fully serviced with new spare parts.
    • 4 hydraulic pipes for Arneson transmission were replaced.
    • Both Generator salt water pumps were replaced and electrical 24V fuel pump too.
    • Full service of 4 hydraulic Arneson pistons (new kit of gasket and O'ring was replaced).
    • Both pistons of oil kit related to the swim platform were replaced.
    • Both Arneson transmission were disconnected from the stern, and sea cock valves, hydraulic pipes, connectors, bilge pumps were replaced.
    • Sound proofing panel in the engine room was fixed.
    • Both MTU main engine heat exchangers fully serviced.

    WORKS IN 2019/2020

    • Replacement of 2 halogen bulbs over the ceiling in the external cockpit area.
    • Crew toilette pump (need to be removed and fully serviced in the workshop).
    • Arneson full service, replacement of 2 big gasket, 40 lt of oil, O’ring and seals on both transmission, check and set the thrust-ball and socket of both transmission (need to remove both propeller, pistons and pipes to insert the new gasket).
    • Check and repair the problem for drains sinks in the main bathroom (need to remove the entire pipes and siphon to perform a best clean).
    • Check and fix a small leak of water from the shower platform . Leak of air condition salt water pump in the engine room.

    WORKS IN 2020/2021

    • Antifuling
    • Zinc
    • Replacement of hydraulic hoses for arnes underwater
    • Replacement of the main valve of the engine
    • New navigation one screen