CHANGE ORDER
Yacht for Sale
Length:
31′ 3″ / 9.53m
| Builder: Regulator
| Year: 2025
CHANGE ORDER Yacht for Sale - 31 Regulator
Type:
Motorboat
Category:
Center Consoles
Builder:
Regulator
Model:
31
Condition:
Used
Length:
31′ 3″ (9.53m)
Beam:
10′ 3″ (3.12m)
Engines:
2x Yamaha Model: Twin XF450, 450hp
Draft:
2′ 11″ (0.89m)
Price:
$640,000 USD
Contact Us For More Information
Detailed Information
Trailer Info
- 2025 AmeraTrail model 3032TTPB
- 21,000 lb GVWR
- Triple Torsion Axle Aluminum I-Beam trailer with forward Target Bunks
- Stainless steel hardware package
- LED Light Package
- Electric over Hydraulic Brakes (disk brakes on all 3 axles)
- Aluminum Wheels for all 7 tires (including spare)
- Spare Tire mount with Spare Hub assembly
- all tires are 235x16 ER Radial tires
- Vee Stop bow catcher
- Heavy Duty Jack Stand
- PVC Guide Poles
