VIKING III
Yacht for Sale
Length:
114′ 10″ / 35.02m
| Builder: Notika Teknik
| Year: 2004 / 2023
VIKING III Yacht for Sale - 114 Notika Teknik
Contact Us For More Information
Detailed Information
GALLEY / HELM / PILOTHOUSE
• Delonghi Fryer
• Tefal Waffle Maker
• AEG Freezer – OKO Arctics
• Dishwasher Veestan NLA3W
• Electrolux Stove Series 300
• Thermomix TM6-1
• Asko Oven OCS 86664A
• Samsung Mircowave Brandt SE2616B
• Walk in Fridge – Custom built
• Small fridge x 2 – Custom built
• Tefal Toastie Machine
ENTERTAINMENT EQUIPMENT
Main Salon
• Flat screen TV, Soney Monitor 43’
• USB TV lift+TV & Amp On/Off.
• Ceiling Speakers
Sundeck
• Proofvision 55” TV
• Ceiling Speakers
Master Stateroom
• Flat screen TV,
• Monitor 43” Panasonic LED-TV
• Sat. TV, Internet, Movies, Music
• Ceiling Speaker system
Guest Cabins
• FWD Flat screen TV
• Monitor 27.5” LG LED-TV
• Sat. TV, Internet, Movies, Music
• Ceiling speaker system
Guest Cabin Aft
• Flat screen TVMonitor
• 23” LG-TV
• Sat. TV, Internet, Movies, Music
• Ceiling speaker system
Deck Guest Cabin
• STB Flat screen TVMonitor 23” LG-TV
• Sat. TV, Internet, Movies, Music
• Ceiling speaker system
Captain’s Cabin
• Flat screen TVMonitor 23” LG-TV
• Sat. TV, Internet, Movies, Music
• Ceiling speaker system
Galley
• 32” LG-TV
• Sat. TV, Internet, Movies, Music
• Ceiling speaker system
Laundry
• Ceiling speaker
OFFICE EQUIPMENT
Bridge Deck
• HP ENVY all in one Printer / Scanner
Computers
• Ships computer: ASUS Visobook
OWNERS STATEROOM
• Digital electronic type safes are provided for the owner, all
• Spacious full beam cabin on the Main Deck with private entrance,
king size
bed, and on suite bathroom
• Jacuzzi tub and enclosed bidet and toilet
GUEST STATEROOMS
• Large cabin on the Forward Lower Deck with queen size bed
and on suite
bathroom
• Double cabin on the Port side Lower Deck with queen size
bed and on suite
bathroom
• Double cabin on the Starboard side Lower Deck with queen
size bed and on
suite bathroom
• Large cabin on the Aft Lower Deck with queen size bed and
on suite
bathroom
• Digital electronic type safes are provided for all guests
CREW QUARTERS
• 1 Miele Clothes Washer
• 1 Miele Clothes Dryer
• Digital electronic type safes are provided for Captain’s Stateroom
• 7 crew in 4 cabins
COMMUNICATION / NAVIGATION EQUIPMENT
• Satcom – None
• Cellular System – Pepwave
• WIFI - Pepwave and Starlink
• VHF Radiotelephones - 6 ICOM
• Watchkeeping – BWAS
• Exchange – Microsoft
• UHF Communications – Ansoho
• Magnetic Compass – Plastimo
• Automatic Pilot – Furuno
• LOG – Furuno
• Echo Sounder – Furuno
• Radar - Furuno X Band
• Chart Plotter – Timezero
• GPS – Furuno
• Navtex – Furuno
• Wind Instruments – Furuno
• AIS - Raymarine B
SUNDECK
• Custom Jacuzzi
• Sauna
• Bar
• 1 Gastro Heo Ice maker
• 1 x Refrigerator
AFT DECK
• Built in seating and alfresco dining area on the main deck aft
DECK EQUIPMENT
• Anchor Windglass- 2 x Hydraulic windlass with gypsies and
rope drums
• Aft Warping Capstans - 2 x Hydraulic electric capstans on aft
deck
• Ground Tackle - N/A Anchor Chain PT 130meters STB 110
Meters
• Boat Crane & Davits – NONE
• Passerelle – Besenzoni
• Searchlights - 2 ITT Jasbsco
• Awning - Custom Made on Sundeck
• Sauna - Custom made on Sundeck
SWIM PLATFORM
• Swimming Ladder- Custom
• Swimming Platform - fixed, with garage for water sports
access
ENGINE ROOM
• Main Engines - 2 x MTU 16v 2000, 1998
• Motor Ship, Twin Screw
• Int. Combustion Diesel
• Engine Hours - PORT 3720 Hours - SDB 3844 Hours
• Speeds and Fuel
Maximum speed 22 kn
Cruising speed 16 kn
Economical speed 14 kn
• Consumptions per hour, per engine
• 350 litres/per hour @ Maximum speed
• 130 litres/per hour @ Cruising speed
• 102 litres/per hour @ Economical speed
Range per engine
• 22 kn (Main & Extended Range Tanks)- 1361 Nm 680 NM
• 16 kn (Main & Extended Range Tanks) - 2665 Nm 1332 NM
• 14n (Main & Extended Range Tanks) - 2972Nm 1486 NM
• 2 GEARBOXES ZF BW 255 P
• Main Generators 2 x Perkins
• Generator Hours - October 2024
• Port Gen 6179 hrs
• Starboard Gen 8902 hrs
ANCILLARY EQUIPMENT
• Rudder Angle Indicators – Simrad
• Stabilizers – None
• Trim Tabs (interceptors) - Wesmar but not “0” Speed
• Fuel Filters – Rocor
• Fuel Oil Seperator - Alfa Laval
• Bildge Pump – Gianneschi
• Fire Pump – Gianneschi
• Boilers – Gianneschi
• Sewage Treatment – Hamman
• WC’s – Microphor
• Airconditioning – Webasto 3 Compressors
• Ventilation- Gianneschi (engine room ventilation)
ELECTRICAL EQUIPMENT
• Electricity 440 volts 50 Hz, 220 volts
• Shore Power 1 (one) Shore Power Converter, 125 kVA (99
kW), 400V 3 Phase and neutral 50 Hz
SAFETY, SECURITY, AND FIREFIGHTING EQUIPMENT
Safety:
• Smoke Hood - x 4 Spasciani
• EEBD - Scott Safety
• Lifejacket x 6 - Lalizas
• Lifejacket x 4 - 4 Water
• Lifejacket - Plastimo
• Lifejacket Inflatable - 4 Water
• SART - Sailor
• SART AIS - Jotron
• Emergency VHF - Simrad
• Flairs Smoke - 4 Water
• Flairs Parachute - DNS
• Flairs Handheld - DNS
• Line Throwers x 2 - Comet
• BA Bottles x 4 - Sabre
• BA Mask – Scott
Medical:
• Med Air: Solas B kit (under annual subscription)
Fire Fighting:
• Fire Extinguishers Fixed fire systems
Alarms and Monitoring Systems
• 1 Marinelec Fire System
Security:
• CCTV Aft Deck
TENDERS AND TOYS
• 1 ZODIAC 470 DEL Tender
• 1x Seadoo spark
• 2 x Kayak
• 1 x Seabob
• 2 x Ringo Towable
• 2 x Waterski set
• 3 x ski Boards
• 2 x wakeboards
• 1x SUP inflatable paddle
• Snorkeling equipment
• 1 set of free gym weights
UPGRADES / REFITS
• 25 Year Class works and survey completed
• Top and Bottom end Generator service - cylinders and pistons replaced - extensive
MTU works carried out in 2022
• Boroscopic Analysis 25 years survey completed and approved
• Fire alarm system renewal
• Fire Pump overhaul
• Bilge Pumps overhaul
• Hull survey and antifouling
• Underwater lights installation
• Pipe work and plumbing completely changed
• Passarelle stanchions and mounts repaired and maintenance check
• Fuel tank repaired
• Hot water heater replaced
• Outboard engine regulator replaced
• Full interior revamp - Upholstery for sofas, chairs, cushions (int and ext),
poufs, new blinds replaced, new carpet throughout the yacht
• Starlink installation
• Major engine works and general maintenance carried out totalling €600,000
in Cap D’ail